Project Archive List – Food, Beverage and Cold Storage

Pioneer Growers Cooperative, design/build, Edwards Construction, Belle Glade, Florida
Initially a 120,000 SF +/- vegetable processing facility (corn, green beans & radishes), reduced to a 35,000 SF insulated tilt-wall, refrigerated Corn Tray-Pack facility. Scope included operations from unloading field trucks to completed tray-pak operations & cold storage. Our scope includes schematic planning, permit and construction documents and limited construction administration.

TKM Farms, design/build, Edwards Construction, Belle Glade, Florida
A new 97,000 SF+/- facility for processing lettuce from field trucks into vacuum tubes, and cold storage and packaging process rooms. The building was constructed using perimeter insulated tilt-wall panels, and interior liner panels. A two-story office included management offices, employee break rooms and locker rooms, quality control labs and shipping offices. A dry storage area is designed for cold storage/process conversion and the whole building/site is designed for expansion.

Taylor Farms Phases I, II & III Renovation/Expansion, design/build, Edwards Construction, Orlando, Florida
Major Renovations of a vegetable processing facility that included re-working the break room area and creating a new covered break area, relocating the Onion Line and expanding the Cold Storage areas; also provided some new finishes for the office area. The facility remained in operation during theses renovations.

Bernie Little Distributors, Inc., McCorkle Construction Company, Ocala, Florida
Major Renovation/Conversion of an existing pre-engineered warehouse for Anhueser- Busch beer distributor including a 35,000 SF Controlled Environment Warehouse , a 5,000 SF Draft Cooler and a 2,000 SF custom finish “Hospitality Room”. The facility remained in operation during the renovation.

City Beverage, Inc., McCorkle Construction Company, Orlando, Florida
152,500 SF build-to-suit beer distribution facility for Anhueser-Busch products. The project included 20,160 SF of office, 112,300 SF of C.E.W. /warehouse and utilized the Thermo-mass insulated tilt-wall system. HHC worked with the Design Builder, local owner and A-B during the design process.

Schenck Distribution Facility, Design Build, Williams Company, Orlando, Florida.
300,000 SF build-to-suit beer distribution facility for Coors & Miller products as well as an array of domestic and imported brands. The project includes a 34,000 SF cooler and 30,000 two-story office component. Building is 28’ clear, concrete tilt-up construction with architectural treatments and features at office entry.

Schenck Corporate Office Building, Design Build, Williams Company, Orlando, Florida.
28,000 SF two story build-to-suit corporate office building with high-end interior finishes. Building is of concrete tilt-up construction.

SYSCO Food Services of Central Florida, McCorkle Construction, Ocoee, Florida
Major Design/Build expansion for a regional food distribution company that includes 24,000 SF of two-story office space, 14,000 SF of 28 degree F cooler, and 58,000 SF of 37’ clear dry warehouse as well as renovating 24,000 of existing office space and 6,000 SF of warehouse operations offices.

Premier Beverage, East Group Properties, Tampa, Florida
220,000 SF build-to-suit wine and spirits distribution facility that included both ambient and cold storage, 25,000 SF of two-story office and a temperature/humidity controlled environment for part of the warehouse; coordinated w/ user materials handling system.

Coca-Cola Enterprises Warehouse Expansion, Check-In Canopy & Truck Maintenance Facility, Current Builders, Orlando, Florida
138,000 SF tilt-wall Expansion of an existing warehouse for beverage distributor; scope also included a new three-bay check-in/check out canopy and a new two-bay free-standing service facility. The facility remained in operation during the expansion.

Coca-Cola Enterprises Warehouse Expansion, Current Builders, Ft. Myers, Florida
36,250 SF tilt-wall Expansion of an existing warehouse for beverage distributor, included adding two recessed receiving truck-wells. The facility remained in operation during the renovation.

Dairy-Mix Addition/Renovation, The Perry Company, St. Petersburg, Florida
16,000 SF addition to bulk milk-shake manufacturing facility; renovation of existing warehouse and minor office renovation. This project utilized Thermo-mass insulated tilt-wall construction, block construction in extremely tight site constraints. Facility remained operational during expansion/renovation.

SYSCO Food Services of Central Florida, McCorkle Construction, Ocoee, Florida
Major Design/Build expansion for a regional food distribution company that includes 24,000 SF of two-story office space, 14,000 SF of 28 degree F cooler, and 58,000 SF of 37’clear dry warehouse as well as renovating 24,000 of existing office space and 6,000 SF of warehouse operations offices….plant & offices operated during all 6 phases of 14 month construction.

Bernie Little Distributors, Inc., McCorkle Construction Company, Ocala, Florida
Major Renovation/Conversion of an existing pre-engineered warehouse for Anhueser-Busch beer distributor including a 35,000 SF refrigerated Controlled Environment Warehouse, a 5,000 SF Draft Cooler and a 2,000 SF custom finish “Hospitality Room”………all constructed on-site with high volume operations on-going. The refrigerated areas were built with prefabricated insulated metal wall/ceiling panels.

Hellmann International Forwarders, Inc., Miami, Florida
85,000 SF warehouse expansion that included a two-story office at the south that is approximately 9,450 GSF; a 9,112 SF 32F degree freezer; a 9,112 SF 28F degree freezer and a 19,551 SF 45F degree cool dock. The facility was built using tilt-wall construction.

City Beverage, McCorkle Construction Company, Orlando, Florida
Design/Build to suit for Anhueser Busch totaling approximately 132,500 SF which included 20,000 SF of office space and 112,500 SF of refrigerated cooler space. The facility was built using Thermomass insulated tilt-wall construction

Schenck Co. Beverage Distributor – Williams Company, Orlando, Florida
Design/Build to suit for Schenck Company approximately 300,000 SF distribution facility with 41,257 SF of refrigerated cooler space and a 30,000 SF corporated office building. The air conditioned and refrigerated portion of warehouse facility was built using thermo mass insulated tilt-wall construction.

Dairy-Mix, The Perry Company, St. Petersburg, Florida
Design Build addition for fast-food milkshake plant included use of Thermomass insulated tilt-wall system.