|
|
|
PARKING STRUCTURES |

Gallery |
|
Parking structure projects include residential, mixed-use
and commercial Parking Structures. Below is a sampling of our parking
structure projects.
SECURE STRUCTURES / SECURE FACILITIES
Secure structure projects include Detention, Temporary Holding and Secure Facilities. Below is a sampling of our secure
structure projects.
|
|
PARKING STRUCTURES
Phillips Westshore Parking Garage,
The Perry Company, Tampa Florida
|
Six level, 625 space, 218,350 SF parking garage
constructed of architectural pre-cast structural elements on a pre-cast
concrete frame. Design/Build Project to be completed in Spring of 2008.
|
|
Moorings at Lantana Parking Garage,
Current Builders, Lantana, Florida |
Six-level, 806 space, 201,432 SF parking garage
constructed using post-tensioned cast-in place structural & architectural
elements. Design/Build Project is due to be completed in 2004.
|
|
Marina Village Parking Garage,
Current Builders, Boynton Beach, Florida |
Six-level, 576 space, 276,495 SF parking garage
constructed of architectural pre-cast structural elements on a pre-cast
concrete frame. Design/Build Project was completed in September 2002.
|
|
JFK Medical Center Parking Garage,
R.R. Simmons Construction, Atlantis, Florida |
Six and one half level, 523 space, 188,000 SF parking
garage constructed of architectural pre-cast structural elements on a
pre-cast concrete frame. Design/Build Project was completed in September
2002.
|
|
Doctors Hospital of Sarasota
Parking Garage, R.R. Simmons Construction, Sarasota, Florida |
Two-level, 540 space, 191,000 SF parking garage space
constructed of architectural pre-cast on a concrete structure. Project was
completed in December 2001.
|
|
Maitland Promenade Parking Garage,
Opus South Corporation, Maitland, Florida |
Three-level, 1,000 space parking garage constructed
using architectural pre-cast on a concrete structure. HHC work included an
architecturally enhanced “pedestrian connector” to a Class “A” Office
Building. Project was completed in May 1999.
|
|
Oristo of Florida Parking Garage,
R.R. Simmons Construction, Palm Harbor, Florida |
Two level, 704 space, 117,000 SF parking garage
constructed of precast concrete structural elements.
|
SECURE STRUCTURES / SECURE FACILITIES
Immigration Naturalization Services Facility at Birchwood Office Building, Ed Taylor Construction, Jacksonville, Florida |
18,000 SF tilt wall structure with 9700 sf of office and a short term holding facility for processing immigration cases.
|
|
Marathon Border Patrol Station, The Kings Enterprises of the Keys, Marathon, Florida |
Interior renovation and concrete block addition of short term holding facility. 7400 sf office and holding cell retro-fit and expansion.
|
|
|
|
<
Back to Top > |
|